No casualties recorded in GNI House demolition, says LASEMA

The Lagos State Emergency Management Agency (LASEMA) says the controlled demolition of the fire-damaged Great Nigeria Insurance (GNI) House on Martins Street, Lagos Island, is progressing safely, with four floors already demolished and no casualties recorded.
The agency also dismissed reports circulating on social media that someone fell from the building during the operation, saying no major damage had been recorded to neighbouring properties.
The Permanent Secretary of LASEMA, Dr Olufemi Damilola Oke-Osanyintolu, described the report as false, insisting that no worker, trader, passer-by or emergency officer had fallen, sustained injuries or lost their life since the exercise began on October 15, 2026.
Addressing journalists at the site, Oke-Osanyintolu explained that the demolition was being carried out through a controlled, top-down mechanical process, with the structure dismantled floor by floor in line with globally accepted safety standards for high-rise buildings in densely populated areas.
“The report is false. No worker, no trader, no passer-by and no officer has fallen, been injured or lost their life since the exercise commenced on Thursday, October 15, 2026. Members of the public are urged to disregard the false claim and rely only on verified information from LASEMA,” he said.
He said the approach allowed engineers to monitor the building continuously and adjust the operation where necessary. He added that safety measures, including exclusion zones, security personnel, traffic diversions, standby medical and emergency teams, dust suppression and the mandatory use of personal protective equipment, had been put in place.
The permanent secretary recalled that the 25-storey building was gutted by fire on December 24, 2025, resulting in the death of 12 people. He said Governor Babajide Sanwo-Olu ordered its demolition after structural assessments established that the building had become a threat to public safety.
He reassured traders at Balogun Market that the temporary restrictions around the demolition site were intended to protect them, not disrupt their businesses, adding that the government remained committed to completing the exercise safely to allow commercial activities to resume on Martins Street.







